Blogs & News
Site induction checklist for construction

A site induction checklist lists everything a worker must be told about a specific construction site before they start work: the site rules, its hazards, emergency procedures, amenities, PPE, the SWMS that apply and who to contact, ending with a signed record. It sits on top of the general construction induction (the white card), which covers construction safety in general but not your site. Here is what each induction covers, a checklist you can copy, and the records to keep.
General induction (white card) vs site-specific induction
The general construction induction is a one-off course, “Prepare to work safely in the construction industry”, delivered by a registered training organisation. It covers common construction hazards, basic risk controls, emergency response and PPE. Workers must have a white card before they start on a construction site, and must show it to the person conducting the business or undertaking (PCBU) on site and to any inspector who asks. Under the model WHS framework, if the training was done more than two years ago, the worker must also have done construction work in the last two years. A card from one state is recognised in the others.
The site-specific induction is run by the builder for each site. The white card does not replace it: regulators state that general induction training is not designed to take the place of site or task-specific instruction, training or supervision. It tells the worker how this site works, where the dangers are today, and what to do in an emergency here.
| General induction (white card) | Site-specific induction | |
|---|---|---|
| Who runs it | A registered training organisation | The builder or principal contractor |
| How often | Once, while the worker stays in the industry | For every site, and again when the site changes significantly |
| Covers | Construction safety in general | This site’s rules, hazards, emergency plan and contacts |
| Proof | The white card | Your signed induction record |
Site-specific induction checklist
| Topic | What to cover |
|---|---|
| Before entry | White card sighted, high-risk work licences and trade tickets checked, worker’s company and emergency contact recorded |
| Site rules | Working hours, sign-on and sign-off, access points, visitors, parking, smoking, drugs and alcohol, housekeeping, phone use |
| Site layout | Site plan, exclusion zones, pedestrian and vehicle routes, crane and loading areas, laydown and storage |
| Current hazards | Work at height, open edges and penetrations, mobile plant, cranes and lifting, excavations, electrical, silica and other dust, asbestos, hazardous chemicals, noise, heat |
| Emergency procedures | Alarms, evacuation routes, assembly point, emergency contacts, nearest hospital, how to report an emergency |
| First aid | First aiders, first aid kit locations, how to report an injury |
| Amenities | Toilets, lunch room, drinking water, change rooms |
| PPE | Minimum site PPE and task-specific PPE, and where to get replacements |
| SWMS | High-risk construction work on this site, the SWMS that apply, and that work must stop if the SWMS is not followed |
| Permits | Which work needs a permit, such as hot work or confined space, and who issues it |
| Reporting | How to report hazards, incidents and near misses, and how the daily pre-start works |
| Consultation | Health and safety representatives, toolbox talks, and how to raise a concern |
| Contacts | Site manager, supervisor, safety contact and first aiders, with phone numbers |
| Sign-off | Worker confirms they understood, with name, company, date and signature, and any questions answered |
Keep it short enough that people listen. Put the content that changes, such as today’s crane lift or a new exclusion zone, in the daily pre-start rather than the induction.
Records to keep
- Induction record: who was inducted, when, which version of the induction, and their sign-off.
- White card and licences sighted: card number and the licences checked for the work they will do.
- SWMS acknowledgement: that workers doing high-risk construction work saw and understood the SWMS.
- Daily pre-starts: who attended and accepted each day’s pre-start.
- Who was on site: daily sign-on and sign-off records, by company.
- Induction content: the version used on each date, so you can show what people were told.
How Commnia Site Access runs inductions
- Induction at sign-on: workers sign on by QR code or face, with no app to install, and complete the general and site inductions you set up before they start.
- The record stays against their name: you can see who has completed each induction.
- Pre-starts per person: each worker accepts the day’s pre-start at sign-on.
- Who was on site: sign-ons flow into the Site Diary with labour by company.
- Gates and turnstiles: Site Access integrates with site gates and turnstiles.
- Your own checklists: build site inspections and safety forms in SmartForms, with photos, signatures and required steps that can’t be skipped.
Common questions
Is a white card enough to start work on a site?
No. The white card covers construction safety in general. Each site also needs its own site-specific induction covering its rules, hazards and emergency procedures.
Does a white card expire?
It has no expiry date. But if the training was done more than two years ago, the worker must have done construction work in the last two years. Check your state regulator for the exact rule.
Is a white card from another state accepted?
Yes. General construction induction training is nationally recognised, so a card issued in one state or territory is accepted in the others.
Do visitors need a site induction?
Anyone entering the site needs to know its hazards and emergency procedures. Many sites run a short visitor induction and require visitors to be escorted. Check your own site rules.
How often should the site induction be updated?
Whenever the site changes in a way that affects safety, such as a new stage, new access or a new major hazard. Keep the version history so you can show what each worker was told.
Sources: Safe Work Australia, Working on a construction site; WorkSafe WA, Construction induction training and Construction induction training guidance: inclusions and exclusions. This article is general information, not legal advice. Checked October 2026.
See how Commnia Site Access runs inductions and pre-starts or book a demo with our Australian team.