Commnia Construction Software from pre-construction to handover

Blogs & News

One project record for owners and developers

RFIs, variations and EOTs as they happen, quality you can check, and handover manuals buyers open by QR code. One project record for owners and developers.

← One project record

For owners and developers

You're paying for the project, and you'll own the building long after the site team has moved on. You need to see what's happening while it happens, and keep the record when it's done.

Site team in hi-vis looking up at an apartment building under construction

Every RFI, variation and EOT, as it happens

Correspondence goes out of the Commnia Inbox, so each RFI, variation and extension of time sits in a register with its dates and replies. Approve or reject an extension of time straight from the email. The EOT register shows the total days and the new completion date.

RFI-014Slab penetrationsAnswered
VAR-006Lobby joineryPending
EOT-003Wet weather, 3 daysApproved
RFI-015Facade bracketDue Fri

See what changed before you approve a variation

When a consultant issues a new revision and the builder prices the change, the variation can arrive with an overlay of the two revisions attached, and the transmittal that issued them is on the record. You see exactly what moved before you approve, and everyone is looking at the same drawings.

S-110Slab set-out, Rev ENew
S-110Compared with Rev DOverlay
VAR-012Slab edge moved 300 mmPending
PDFOverlay of Rev D and Rev EAttached

Quality you can check, not take on trust

ITPs run in SmartForms, where required steps can't be skipped. Defects are captured with photos, location and a markup on the drawing, assigned to the trade and tracked to close-out. NCRs sit in the same record.

Substrate prepared
Primer to spec
Flood test, photos attached
Supervisor sign-off

Who was on site, every day

Workers sign on by QR code or face, with no app. Sign-ons flow into the Site Diary as labour by company, and the weather is recorded automatically each day.

Formwork0
Electrical0
Plumbing0
Head contractor0
Site Diary, TuesdayWeather recorded

The record stays after handover

Defect claims can arrive years after completion. In 2023, 53% of NSW strata buildings had serious defects, at about $283,000 each to fix. Aftercare keeps the drawings, transmittals, inspections and correspondence available after handover, so there's a record to answer them.

Drawings
Transmittals
RFIs
ITPs
Defects
Site Diary
Kept after handover

Handover your buyers can open with a phone

Put a QR code inside each unit. Scanning it opens that unit's folder of manuals, warranties and as-built drawings on any phone, with no app and no login. You choose which Drive folders are public, and the link keeps working after the project is archived.

Unit 104Scan inside the unit. No app, no login.
FolderAppliances6 files
FolderWarranties4 files
PDFAs-built floor planOpen

The builder, the consultants and the trades work from the same record. What you see is what they see, so questions get settled on the facts.

Common questions

Can I see what changed in a revision?

Yes. Compare any two revisions in the Document Register as an overlay, on the web or on the iPhone and Android app. A variation sent from a comparison carries the overlay with it.

Can an owner see RFIs and variations without chasing the builder?

Yes. They sit in the project's registers in Commnia, with their dates and replies, for everyone with access to the project.

Can I approve an extension of time from my email?

Yes. The approver can approve or reject an EOT straight from the Commnia email, and the completion date moves forward when it's approved.

Do buyers need an app to open the handover manuals?

No. They scan the QR code in their unit and the folder opens in the phone's browser, with no app and no login: manuals, warranties and the unit's as-built drawings.

What happens to the project record after handover?

Aftercare keeps it available after the project finishes, for the years a defect claim can arrive.

See it on one of your projects

20 minutes with our Australian team, on your own drawings and correspondence.

Book a demo

Other seats on the project

Source: Building Commission NSW and Strata Community Association NSW (2023), Research on serious building defects in NSW strata communities. General information, not legal advice. Checked November 2026.