Commnia Construction Software from pre-construction to handover

Blogs & News

One project record for builder-developers

Tender to award without re-typing, one register for both seats, and a handover record that stays with the asset. Commnia for builder-developers.

← One project record

For builder-developers

You run the build and you own the asset. Your site team needs to move fast today, and your business needs the record for years after handover. Commnia keeps both in one place.

Two builders reviewing a tablet beside an excavator on site

From tender to award, without re-typing

Send trade packages, issue addenda to every tenderer at once and compare bids side by side. The awarded subcontractor carries straight into the project, with the tender correspondence.

ApexFormwork, Level 3Awarded
BaysideFormwork, Level 3Compared
CoastalFormwork, Level 3Compared
ADD-02Addendum to all tenderersSent

Both seats, one register

RFIs, variations and extensions of time go out of the Inbox and sit in registers with their dates and replies. The approver can approve or reject an EOT from the email, and the register shows the new completion date.

RFI-014Slab penetrationsAnswered
VAR-006Lobby joineryPending
EOT-003Wet weather, 3 daysApproved

Catch design changes before they're built

Your consultants issue new revisions, and as the developer you pay for every change. Compare each new revision with the last one as an overlay and see what moved, then issue it to the trades by transmittal so nobody builds from the old one. A shared OneDrive or SharePoint folder gives everyone the latest file, not what changed in it or who has it.

A-201L3 plan, Rev DNew
A-201Compared with Rev COverlay
TR-051Issued to Apex FormworkSent
TR-051Opened Mon 7:12 amOpened

Quality you will live with

ITPs in SmartForms, where required steps can't be skipped. Defects with photos, location and a markup on the drawing, assigned to the trade and tracked to close-out. NCRs and back charges in the same record.

D-118Unit 304 bathroom, Apex WaterproofingOpen
D-121Lobby ceiling, Coastal LiningsClosed
NCR-03Balustrade fixingsClosed

The record stays with the asset

In 2023, 53% of NSW strata buildings had serious defects, at about $283,000 each to fix. Aftercare keeps the drawings, transmittals, inspections and correspondence available after handover.

Drawings
Transmittals
RFIs
ITPs
Defects
Site Diary
Kept after handover

Handover your buyers can open with a phone

A QR code inside each unit opens its folder of manuals, warranties and as-built drawings on any phone, with no app and no login. The link keeps working after the project is archived.

Unit 104Scan inside the unit. No app, no login.
FolderAppliances6 files
FolderWarranties4 files
PDFAs-built floor planOpen

Your site team, consultants and trades all work from the same record, so the business sees what the site sees.

Common questions

Is a shared OneDrive or SharePoint folder enough for drawings?

For storing files, yes. It doesn't show which revision is current, record which revision went to which trade and when, or compare revisions. Those gaps are where rework starts. More in the cost of disconnected construction systems.

Can we run our tenders in Commnia?

Yes. Send packages, issue addenda to every tenderer at once, compare bids side by side and award. The awarded subcontractor carries into the project.

Do we set the subcontractor up again after award?

No. The awarded subcontractor carries into the project, with the tender correspondence.

What happens to the record after handover?

Aftercare keeps it available after the project finishes, for the years a defect claim can arrive.

See it on one of your projects

20 minutes with our Australian team, on your own drawings and correspondence.

Book a demo

Other seats on the project

Source: Building Commission NSW and Strata Community Association NSW (2023). General information, not legal advice. Checked November 2026.