The cost of disconnected construction systems: tendering, correspondence, quality and safety

What it costs a builder to run tenders, correspondence, drawings, quality and safety on separate tools, and what one project record changes.

The RFI answer is in the project manager's inbox.The project manager left in March.Now nobody can show who agreed to the change.

Tired construction worker wiping his brow, hard hat in hand

Running tenders, correspondence, drawings, quality and safety on separate tools costs a builder in three ways: hours spent looking for information, rework built from the wrong information, and exposure after handover, when the record you need is gone. Here is where each cost comes from, what it adds up to on a $20 million apartment job, and what one project record changes.

The problem

What the gaps cost an Australian project

0 ha week, per person, spent looking for project informationFMI and PlanGrid, Australia and NZ, 2018
0%of a builder's yearly profit lost to reworkLove et al., 346 Australian projects, 2018
0%of NSW strata buildings with serious defectsBuilding Commission NSW and SCA NSW, 2023
Separate toolsOne project recordTender spreadsheetsTenderingPackages, addenda, bidsPersonal inboxesCorrespondenceRFIs, transmittals, emailShared driveDrawingsRevisions and markupsPaper and ExcelQualityITPs, defects, NCRsSign-on app, paperSafetySign-on, inductions, SWMSDiary bookSite DiaryLabour, weather, incidents
Six tools with no links between them. Every handover is re-typed, emailed or lost.

Each tool can do its own job well. The cost sits between them, in every handover someone has to re-type, forward or remember. Here are the five places it leaks.

1. Tendering

The scope gap starts at tender

Addendum 3 moves the balcony waterproofing from the tiling package to the waterproofing package. It goes out by email to the tenderers someone remembered. The waterproofer who wins never saw it, prices without it, and the argument starts on the first balcony.

None of this shows up at tender. It shows up months later as a variation claim, a back charge, or a trade working to a scope nobody agreed. Meanwhile the subcontractor's details are typed again into the project system, and the tender correspondence stays in someone's inbox.

What one record changes

In Commnia, addenda go to every tenderer at once, and you can see when each bidder viewed the tender. Bidders reply with questions from Outlook or Gmail, so clarifications stay in the tender correspondence, and every tenderer works from the same answers. Compare bids side by side, award, and the subcontractor carries into the project.

Separate toolsTenderProjectSubcontractorSubcontractorre-typedAddendamissingClarificationsmissingInboxstays behindOne project recordTenderProjectSubcontractorSubcontractorAddendaAddendaClarificationsClarificationscarries in
After award, separate tools carry only what someone re-types. Addenda and clarifications stay in the tender inbox, which is where scope arguments start.

2. Correspondence

The notice you can't prove you sent

Most head contracts, AS 4000 among them, set strict time limits for notices of delay, variations and extensions of time. A claim that is right on the facts can still fail because the notice went late, went to the wrong person, or can't be shown to have been sent. The same goes for the RFI answer that proves a variation was directed.

That is the story at the top of this page. When RFIs and instructions live in personal inboxes, they leave with the person. The owner can't see what was asked, the builder can't show what was answered, and the trade is stuck in the middle.

What one record changes

In Commnia, RFIs, transmittals, extension of time claims and every other item go out of the Inbox, each send logged with its date, sender and recipient. Project email is filed from Outlook, so the whole team can find it. The approver can approve or reject an extension of time straight from the email, and the EOT register shows the total days and the new completion date.

RFI sent to the architectsent 3 MarAnswer received and filedfiled 6 MarRevised drawing by transmittalsent 9 MarMarkup on revision Csaved 9 MarVariation settledeveryone sees it
Owner, builder and consultant all see the same records, each logged with its date, sender and recipient. In personal inboxes and a shared drive, they leave with the person who sent them.

3. Drawings and documents

The most expensive gap, and the one builders underrate

Rework is where disconnected systems cost the most. A 2018 study of one Australian builder's own records, covering 19,605 rework events across 346 projects from 2009 to 2015, found rework cost an average of 0.39% of contract value. That sounds small. Against a builder's margin it isn't: it cut the company's average yearly profit by 28% (Love and others, 2018). Earlier Australian research found errors and omissions in contract documents among the main causes of rework.

0%

of contract value went on rework, across 346 projects

0%

of the builder's average yearly profit, gone

How it happens with one shared folder

On Monday the engineer issues revision D of the level 3 slab set-out: two penetrations have moved. It goes into the shared folder, next to revision C. The formwork crew saved revision C to a tablet last Thursday. The plumber works from a printed set. On Wednesday the slab is poured to revision C.

Now the questions start. Was revision D issued? To whom, and when? Did the formwork crew have it? The folder shows the file is there. It can't show who was sent it, who opened it, or what they were told had changed. The cost is core holes, an engineer's sign-off and a lost day, then a dispute about who pays.

Isn't OneDrive or SharePoint enough?

For storing files, yes. Plenty of builders run a job from one shared folder of the latest documents, open to every trade, and it feels free. The cost sits in what a folder was never built to do.

Shared folder

A-201 L3 plan Rev C.pdfCurrent?
A-201 L3 plan Rev C FINAL.pdfCurrent?
A-201 L3 plan RevD (2).pdfCurrent?
S-110 slab set-out.pdfWho has it?

Document Register

A-201L3 plan, Rev DCurrent
A-201L3 plan, Rev CSuperseded
TR-051Issued to Apex FormworkSent
TR-051Opened Mon 7:12 amOpened
The questionShared folderDocument register
Which revision is current?Whatever the file name saysEach drawing has one current revision; older ones are marked superseded
Who was issued it, and when?No record once a file is saved, synced or forwardedEvery issue goes by transmittal, each send logged, with when each document was first and last opened
What changed?Open both and compare by eyeOverlay compare shows the change
Where's the question about it?An email with a screenshot, in one person's inboxMarked up on the drawing and sent as an RFI from it, filed to the project
Can we find it in year 9?Only if nobody tidied up the folderAftercare keeps the record after handover

A well-run SharePoint, with columns, approvals and tight permissions, is better than a messy one. But it still stores files rather than issuing them. It doesn't keep a register of which revision went to which trade, when, and why, so someone on your team becomes the document controller by hand, on every job.

On apartment jobs in NSW, the Design and Building Practitioners Act raises the stakes. Regulated designs and their compliance declarations are lodged on the NSW Planning Portal before work starts, a building compliance declaration is made before the occupation certificate, and owners can claim for defects under the Act's duty of care for 10 years. A register of which revision was issued to which trade, and when, is the evidence everyone needs if a question comes up years later.

It protects the trades as much as the builder. A subcontractor who can show they built to the revision they were issued is not the one paying for the core holes.

What one record changes

Commnia's Document Register takes every file type, keeps the current revision obvious, compares revisions by overlay and keeps markups on the drawing. Subcontractors work from the latest revision and raise a query straight from the document, with the markup attached. On the phone, PDF drawings and documents work offline. More in what poor document control really costs a builder.

4. Quality

Defects you pay for after handover

The 2023 Building Commission NSW and Strata Community Association survey found serious defects in 53% of strata buildings, at an average of about $283,000 per building to fix. Waterproofing and fire safety were the most common problems.

53 in 100NSW strata buildingswith serious defects$283kaverage cost to fix
Waterproofing and fire safety were the most common serious defects. Source: Building Commission NSW and Strata Community Association NSW, 2023.

When ITPs live on paper and defects in a spreadsheet, nobody can show which inspection was done, by whom, against which drawing revision. That is the evidence the owner and the builder both need when a defect claim arrives, and it can arrive years after the trades have left.

What one record changes

In Commnia, ITPs run in SmartForms, where required steps can't be skipped, and a failed ITP check raises a defect with the ITP attached. Defects are captured with photos, location and a markup on the drawing, assigned to the trade and tracked to close-out. NCRs and back charges sit in the same record.

5. Safety and site

Four answers you need the day something goes wrong

37 workers died in construction in 2024, one in five of all work-related deaths in Australia (Safe Work Australia, 2025). In NSW, industrial manslaughter now carries a maximum penalty of $20 million for a company and 25 years' jail for an individual.

After an incident the questions are simple: who was on site, were they inducted, had they signed the SWMS, and did they accept that day's pre-start. If the answers sit in a sign-on app, induction files, a folder of paper SWMS and a diary book, putting them together takes days.

Separate toolsOne recordSign-on appWho was on site?Induction filesInducted?Paper SWMSSWMS signed?ClipboardPre-start accepted?Commniaprojectrecord
After an incident you need four answers fast. Spread across four places, they take days. In one record, sign-on, inductions, SWMS and the pre-start sit together.

What one record changes

Workers sign on by QR code or face with no app, complete inductions and accept the daily pre-start. SWMS and safety forms run in SmartForms. Sign-ons flow into the Site Diary with labour by company, and the weather is recorded automatically.

The total

What it adds up to on a $20 million apartment job

Take a 12-month, $20 million apartment build with a site and office team of 10, and apply the Australian figures above.

WhereWhat the research saysOn this job
Searching4.9 hours a week, per person, looking for project informationAbout $225,000 a year (10 people, 46 weeks, $100 an hour)
ReworkRework cut one Australian builder's yearly profit by 28%$280,000 if your margin on the job is $1 million
After handoverSerious defects cost about $283,000 per NSW strata building to fixExposure for up to 10 years, if the record can't show what was approved and built

These are averages, not a forecast for your job, and not all of it comes from disconnected tools. But most of it starts the same way: the information existed, in a place the person who needed it couldn't see.

The solution

One project record, shared by everyone on it

A project goes well when the owner, the builder, the consultants and the trades all have what they need from the same record. Commnia keeps tenders, correspondence, drawings, quality, safety and the site diary together, on the web and on the phone.

Everything logged

Every RFI, transmittal and email, with its date, sender and recipient.

Single source of truth

Everyone sees the same information, so questions get settled, not argued.

On site, in your pocket

Raise items, open drawings offline and sign on from the phone.

Tender awardedSubcontractor in the projectcarries inRFI answered and filedasksRevised drawing by transmittalleads toITP inspection finds a probleminspectedDefect marked up on the drawingraised asTrade signs on, inductedfixes on siteSite Diary: labour by companyflows into
One record, start to finish: nothing is re-typed between tender, correspondence, drawings, quality and the site.
1Open the drawinglatest revision2Compare revisionssee what moved3Mark up the changecircle it on the drawing4Send itRFI, EOT or variation5Manage ittracked in the register
One flow on the phone: open the latest drawing, compare it with the last revision, mark up the change and send it as an RFI, extension of time or variation, straight from the drawing. It is tracked in the Inbox register and stays linked to the drawing.

Being straight with you

What one record won't fix

Software doesn't fix everything. Here is what to expect.

It won't fix a wrong drawing

If a consultant issues a drawing with an error, it's still wrong. What changes is that everyone can see who issued it, who received it and when, so the RFI goes in early and the corrected revision goes out to everyone.

It only works if everyone uses it

If half the RFIs still go out from personal email, half the record is missing. The value comes from every RFI, notice and transmittal going out of the same Inbox.

It won't make your contract decisions

Commnia keeps every notice and the date it was sent. Deciding what to claim, and when a notice is due under your contract, is still up to you.

What it means for you

Pick your seat on the project

Common questions

Is OneDrive or SharePoint enough for construction documents?

For storing files, yes. For document control, not on its own: a folder doesn't show which revision is current, record which revision was issued to whom and when, or keep the RFIs and markups with the drawing. Those gaps are where rework and disputes start.

How much does rework cost on a construction project?

A 2018 study of 346 projects from one Australian builder's records found rework averaged 0.39% of contract value, which cut the builder's yearly profit by 28%. Small percentages matter because margins are thin.

How much time do builders lose looking for information?

A study of Australian and New Zealand construction leaders found 4.9 hours per person per week spent looking for project information, the largest single cause of unproductive time.

Why should every RFI and transmittal be logged?

Because everyone relies on it. When a variation or delay is questioned, the owner, the builder and the consultant all need to see what was sent, to whom and when. A personal inbox can't show that once the person leaves.

How long should a builder keep project records in NSW?

At least 10 years after completion. The Design and Building Practitioners Act duty of care runs for 10 years, and that is the window in which a defect claim can arrive. Check your contracts and your state's laws.

What safety records does a builder need after an incident?

Who was on site, their inductions, the SWMS they signed and the pre-start they accepted. Check your state's WHS laws for your specific obligations.

See it on one of your projects

20 minutes with our Australian team, on your own drawings and correspondence.

Book a demo

Sources: FMI and PlanGrid (2018), Construction Disconnected, Australia and New Zealand findings. Love, P.E.D., Smith, J., Ackermann, F., Irani, Z. and Teo, P. (2018), "The costs of rework: insights from construction and opportunities for learning", Production Planning and Control. Love, P.E.D. and Edwards, D.J. (2005), "Calculating total rework costs in Australian construction projects", Civil Engineering and Environmental Systems (causes of rework). Building Commission NSW and Strata Community Association NSW (2023), Research on serious building defects in NSW strata communities. Safe Work Australia (2025), Key Work Health and Safety Statistics Australia 2025. Work Health and Safety Amendment (Industrial Manslaughter) Act 2024 (NSW). Design and Building Practitioners Act 2020 (NSW). Dollar figures on the $20 million job are worked examples. This article is general information, not legal advice. Checked November 2026.